This article includes a list of references, related reading, or external links, but its sources remain unclear because it lacks inline citations. (October 2016) |
| Tour des Canadiens | |
|---|---|
![]() Interactive map of the Tour des Canadiens area | |
| General information | |
| Status | Completed |
| Type | Condominiums |
| Location | 1288 Avenue des Canadiens-de-Montréal, Montreal, Quebec, Canada |
| Construction started | 2013 |
| Completed | 2016 |
| Cost | C$230 million |
| Height | |
| Height | 167 metres (548 ft) |
| Technical details | |
| Floor count | 50 |
| Design and construction | |
| Architect | IBI/CHA (Cardinal Hardy) / Martin Marcotte / Beinhaker |
| Website | |
| www.tourdescanadiens.com | |
The Tour des Canadiens is a condominium skyscraper complex in Montreal, Quebec, Canada. It is situated next to the Bell Centre in downtown Montreal, at Avenue des Canadiens-de-Montréal and Rue de la Montagne, and is named for the Montreal Canadiens hockey team, which is a part-owner of the project.
The first tower consists of 552 condos, with nine floors of parking and a large sports bar on the ground floor.
Two subsequent towers were added to the Tour des Canadiens project, with the Tour des Canadiens 2 completed in 2019 and construction on the Tour des Canadiens 3 wrapping up in 2021.
Construction on Tour des Canadiens 1 began in July 2013, and was completed in 2016. As of February 2013, the project had been approved by the city and was 100% sold.
At 50 floors and an estimated 167 metres (548 ft), it is the seventh tallest building in the city, and the second tallest residential tower.
-
Construction site in August 2013
-
Construction site in October 2013
-
Construction site in May 2014
-
Construction site in December 2014
-
Construction site in September 2015