Line 19 (Shenzhen Metro)

Line 19
19
Overview
StatusUnder construction
LocaleShenzhen, Guangdong
Termini
Stations12 (Phase 1)
Service
TypeRapid transit
SystemShenzhen Metro
Services1
Operator(s)SZMC (Shenzhen Metro Group)
History
Planned opening2028; 2 years' time (2028)
Technical
Line length12.5km (Phase 1)
CharacterUnderground
Operating speed80km/h

Line 19 of the Shenzhen Metro is a line under construction, which will connect the districts of Longgang and Pingshan for 33 kilometers and 18 stations.[1] Construction began on 9 May 2024, and the line is expected to open in 2028. The first phase of Line 19 will run from Nantangwei to Julong in Pingshan District, with 12 stations and 12.5 kilometers of track.[2][3] The line is proposed to use 6 car type B trains.[4]

Stations (Phase 1)

[edit]
Station name Connections Location
English Chinese
Nantangwei 南塘围 Pingshan
People's Hospital 人民医院
Tang-keng 汤坑
Jinlong 锦龙 14
Xinwei 新围
Baoshan 宝山
Xinhe 新和 16
Culture Center 文化中心
Pingshan Center 坪山中心 14
Yanziling 燕子岭  Pingshan SkyShuttle Line 1 
Nanbu 南布
Julong 聚龙

References

[edit]

This article is sourced from Wikipedia. Content is available under the Creative Commons Attribution-ShareAlike License.